It must be something wrong, I put the text there this friday, used Liljanas link..

//E

Skickat frĺn Outlook för Android

From: Nenad Stojanovic <nenad.stojanovic@nissatech.com>
Sent: Sunday, March 29, 2026 7:54:56 PM
To: 'bi0space-all@maillist.au.dk' <bi0space-all@maillist.au.dk>
Subject: [Bi0space-all] D3.1 updates for pilots Fw: D3.1 ready for review Re: D3.1 status Re: bi0SpaCE M15 deliverables
 
Hello pilots,

Could you update the corresponding sections in  bi0SpaCE_D3.1 v1.0 - review FhG IOSB.docx
Emilie: Fiskaby section is still missing - could you provide the text as discussed

There are some comments which should be resolved at your earliest convenience, but anyhow during tomorrow

Just remember that we have a teleconference at 13CET, where you could ask for clarifications, if needed

Thanks for your cooperation
Best regards
Nenad 





From: Stojanovic, Ljiljana <ljiljana.stojanovic@iosb.fraunhofer.de>
Sent: 26 March 2026 16:23
To: Nenad Stojanovic <nenad.stojanovic@nissatech.com>; Ahmad Rami Mansour <ramimansour@mpe.au.dk>
Cc: Desislava Assentoft <desas@dtu.dk>; Michail Pitsios <micpi@dtu.dk>; Dev Ramanujan <devr@dtu.dk>; Emilie Rejmstad <emilie.rejmstad@rdmgroup.com>; Stefan Grieder <stefan.grieder@noriware.com>; Emilie Rejmstad <Emilie.Rejmstad@rdmgroup.com>
Subject: RE: D3.1 ready for review Re: D3.1 status Re: bi0SpaCE M15 deliverables
 

Dear all,

 

I have completed a detailed review of D3.1. The updated document has been uploaded here: bi0SpaCE_D3.1 v1.0 - review FhG IOSB.docx.

 

It would be advisable to use this version for the next review, as I have corrected formatting issues with headers and footers.

Most of my comments and changes are of a “cosmetic” nature, but I also made some language edits to improve clarity. Additionally, Figure 4 needs to be revised.

 

I have also included colleagues from Noriware in this email, as “their” section contains several TBDs that need to be addressed during the week.

Please note that the section from Fiskaby is missing.

 

Best regards,

Ljiljana

 

 

 

From: Nenad Stojanovic <nenad.stojanovic@nissatech.com>
Sent: Mittwoch, 25. März 2026 02:05
To: Stojanovic, Ljiljana <ljiljana.stojanovic@iosb.fraunhofer.de>; Ahmad Rami Mansour <ramimansour@mpe.au.dk>
Cc: Desislava Assentoft <desas@dtu.dk>; Michail Pitsios <micpi@dtu.dk>; Dev Ramanujan <devr@dtu.dk>; Emilie Rejmstad <emilie.rejmstad@rdmgroup.com>
Subject: D3.1 ready for review Re: D3.1 status Re: bi0SpaCE M15 deliverables

 

Hello Rami, Ljiljana

 

Attached is D3.1 ready for the review process

There is only one subsection related to sensor installation process (Fiskeby pilot) missing - Emilie confirmed that she will provide the input

 

Best regards

Nenad

 

 


From: Nenad Stojanovic <nenad.stojanovic@nissatech.com>
Sent: 24 March 2026 09:01
To: Stojanovic, Ljiljana <
ljiljana.stojanovic@iosb.fraunhofer.de>; Rami Mansour <ramimansour@mpe.au.dk>
Cc: Desislava Assentoft <
desas@dtu.dk>; Michail Pitsios <micpi@dtu.dk>; Dev Ramanujan <devr@dtu.dk>
Subject: D3.1 status Re: bi0SpaCE M15 deliverables

 

Hello Rami, Ljiljana

 

Just to inform that D3.1 is almost ready

However, I need to do some fine tuning before sending you (AU, FhG) to the review and this should happen in the afternoon

As an excuse: I am traveling and that makes some initial planning changed.

Anyway, I hope that you will have enough time for doing the review as  planned

 

Thanks for understanding

Best regards

Nenad


From: Dev Ramanujan <devr@dtu.dk>
Sent: 19 March 2026 08:41
To: Nenad Stojanovic <
nenad.stojanovic@nissatech.com>
Cc: Desislava Assentoft <
desas@dtu.dk>; Michail Pitsios <micpi@dtu.dk>; Stojanovic, Ljiljana <ljiljana.stojanovic@iosb.fraunhofer.de>
Subject: Re: bi0SpaCE M15 deliverables

 

Thanks Nenad.

 

Dev Ramanujan

Associate Professor
Design for Sustainability Section
Department of Civil and Mechanical Engineering


devr@dtu.dk
+45 93 50 88 48

LinkedIn: https://www.linkedin.com/in/ramanujand/

Google Scholar: https://scholar.google.com/citations?user=5JHqo2oAAAAJ&hl=en

Koppels Allé

Building 402

2800 Kgs. Lyngby

construct.dtu.dk

 

 

From: Nenad Stojanovic <nenad.stojanovic@nissatech.com>
Date: Thursday, 19 March 2026 at 01.46
To: Dev Ramanujan <
devr@dtu.dk>
Cc: Desislava Assentoft <
desas@dtu.dk>, Michail Pitsios <micpi@dtu.dk>, Stojanovic, Ljiljana <ljiljana.stojanovic@iosb.fraunhofer.de>
Subject: Re: bi0SpaCE M15 deliverables

Hello Dev,

 

  1. We anticipate significant risks leading to the deliverable NOT being submitted on time (If yes, what?).
    1. No
  1. We are still missing key inputs from additional partners required for the completion of the deliverable (If yes, who?).
    1. Fiskeby input is missing / assuming to get it very soon
  1. We have NOT informed the deliverable reviewers as yet about the expected review completion timeline (If yes, why?)
    1. We will define new timeline once having all required inputs
  1. We have already sent out the deliverables for review but have NOT received a response from the reviewers (If yes, who?) / 

 

Best regards

Nenad

 


From: Dev Ramanujan <devr@dtu.dk>
Sent: 18 March 2026 10:54
To: George Siaterlis <
george.siaterlis@zerofect.com>; Jacoby, Michael <michael.jacoby@iosb.fraunhofer.de>; Ljiljana.stojanovic@iosb.fraunhofer.de <ljiljana.stojanovic@iosb.fraunhofer.de>; Nenad Stojanovic <nenad.stojanovic@nissatech.com>; Laura Sanz Martín <laumar@cartif.es>; Daniel Gómez Martín <dangom@cartif.es>; Schmidt, Carlos <carlos.schmidt@iosb.fraunhofer.de>
Cc: Desislava Assentoft <
desas@dtu.dk>; Michail Pitsios <micpi@dtu.dk>
Subject: bi0SpaCE M15 deliverables

 

 

Dear SSF, FHG, NISSA, and CARTIF colleagues

 

Since we do not have a project meeting before the M15 deliverable due date (31/03),  I am writing to you to enquire about the status of the deliverables. 

 

Please respond to this email asap if you answer ‘YES’ to any questions below.

 

  1. We anticipate significant risks leading to the deliverable NOT being submitted on time (If yes, what?).
  2. We are still missing key inputs from additional partners required for the completion of the deliverable (If yes, who?).
  3. We have NOT informed the deliverable reviewers as yet about the expected review completion timeline (If yes, why?)
  4. We have already sent out the deliverables for review but have NOT received a response from the reviewers (If yes, who?)

 

Here is a list of the deliverables and reviewers for your convenience:

 

Deliverable

Due Date

Deliverable Name

Lead & Key contributors

Primary Review

Secondary Review

D2.2

M15

bi0SpaCE ontologies

SSF

UNI

NISSA

D2.3

M15

bi0SpaCE technical architecture and data collection framework

FhG, NISSA

DTU

CARTIF

D3.1

M15

Technical documentation on sensor implementation and data pipelines

NISSA

AU

FhG

D3.2

M15

Guidelines for environmental foot-printing of bio-based products

CARTIF, AU, DTU

UNI

SSF

 

 

Best,

Image removed by sender.

Dev Ramanujan

Associate Professor
Design for Sustainability Section
Department of Civil and Mechanical Engineering


devr@dtu.dk
+45 93 50 88 48

LinkedIn: https://www.linkedin.com/in/ramanujand/

Google Scholar: https://scholar.google.com/citations?user=5JHqo2oAAAAJ&hl=en

Koppels Allé

Building 402

2800 Kgs. Lyngby

construct.dtu.dk

 

Information included in this email is classified as Confidential unless stated otherwise.
This e-mail transmission is intended solely for the addressee(s), and may contain legally privileged and/or confidential information. If you received this electronic message in error, please notify the sender and destroy the original transmission and its attachments. Any unauthorized use, copying, distribution, or disclosure is prohibited; neither RDM or any of its affiliates shall undertake any liability with respect to the forwarding of this message or its alteration or falsification.